Oil & Gas 2024 Kampala / Hoima, Uganda

EPC Document Control & Transmittal System — Pipeline Project

A purpose-built document management and transmittal system for a major EPC contractor's Uganda pipeline project — managing 60,000+ engineering drawings, vendor documents, and correspondence across 5 disciplines.

60,000+
Documents Managed
99.2%
Retrieval Accuracy
-78%
Transmittal Cycle Time

The Problem

The contractor was managing 60,000+ engineering documents through SharePoint, email transmittals, and physical drawing registers. Document retrieval, revision tracking, and contractor-client transmittal were all manual and error-prone, causing review cycle delays in a schedule-critical environment.

The Solution

BKI implemented a full document control platform with revision tracking, transmittal register, drawing register, discipline-based access control, and automated reminder workflows. Integration with the client's SAP system was delivered in Phase 2.

Outcome

99.2% document retrieval accuracy. 60,000+ documents migrated and indexed. Transmittal cycle time reduced from 5 days to 4 hours.

Technology Stack

PHP 8 Laravel MySQL Vue.js SAP RFC/BAPI S3 Storage TailwindCSS

Project Details

Sector Oil & Gas
Year 2024
Location Kampala / Hoima, Uganda
Client Engineering Contractor (Confidential)

Key Results

60,000+
Documents Managed
99.2%
Retrieval Accuracy
-78%
Transmittal Cycle Time